linkedin
Vendor Reg. Form

Ongoing Projects

Filter Projects:

1.

Consultancy Services for Project Management of Hospet (NH-67) – Hampi – Gangawati -Sindh

Consultancy Services for Project Management of Hospet (NH-67) - Hampi - Gangawati -Sindhnur (NH-150 A) for NH connectivity to Backward areas/Religious/Tourist places (BRT) scheme.

2.

Pretender services for Construction of 6 laneDurg-Raipur bypass section of NH-53 for Pkg. A and B in

Pretender services for Construction of 6 laneDurg-Raipur bypass section of NH-53 for Pkg. A and B in Chhattisgarh on Hybrid Annuity Mode
3.

Consultancy Services for preparing Structure GAD for 150m and 120m Escape Route ofGujarat. (Petroleu

Consultancy Services for preparing Structure GAD for 150m and 120m Escape Route of Gujarat. (Petroleum, Chemical and Petrochemical Special Investment Regional. Development Authority.)
4.

Rehabilitation and Up-gradation of Jharpokharia-Baripada-Baleswar section of NH-5 in Odisha on EPC M

Rehabilitation and Up-gradation of Jharpokharia-Baripada-Baleswar section of NH-5 in Odisha on EPC Mode.
5.

Consultancy Assignment of collection and analysis of bridge condition and bridge inventory data by M

Consultancy Assignment of collection and analysis of bridge condition and bridge inventory data by MBIU for the purpose of the Major/Minor Bridges on all NHs I in Tamil Nadu & Puducherry (Pkg 13)
6.

Consultancy Services for Design & Drawing and Survey works for Development of Smart Road (Packag

Consultancy Services for Design & Drawing and Survey works for Development of Smart Road (Package 1 Civil Works) in ABD Area of Jaipur
7.

Supervision of project of 4-laning of Mukkola Junction to Kerala/Tamil Nadu Border of NH-47 in Keral

Supervision of project of 4-laning of Mukkola Junction to Kerala/Tamil Nadu Border of NH-47 in Kerala on EPC mode.
8.

Safety consultant of 6 lane green field Firozabad to Etawah&Kanauj to Unnao access controlled e

Safety consultant of 6 lane green field Firozabad to Etawah&Kanauj to Unnao access controlled expressway with service road in Uttar Pradesh on EPC basic (Package II & IV)
9.

Safety Consultants for 2-lane Bi-directional Silkyara Bend-Barkot Tunnel with Escape Passage includi

Safety Consultants for 2-lane Bi-directional Silkyara Bend-Barkot Tunnel with Escape Passage including Approaches on Dharasu-Yamunotri section falling along NH-134 (Old NH-94) in Uttarakhand on EPC Mode.
10.

Consultancy services for Authority`s Engineer for Supervision of `Two lane with hard shoulders of Pf

Consultancy services for Authority`s Engineer for Supervision of `Two lane with hard shoulders of Pfutsero - Phek Road in Nagaland under SARDP-NE on EPC mode.

11.

Technical Audit Consultancy Services for Rehabilitation and Upgrading to 2- lanes/2-lane with paved

Technical Audit Consultancy Services for Rehabilitation and Upgrading to 2- lanes/2-lane with paved shoulders/4 lane configuration from single/intermediate lane and strengthening of stretches of various National Highways in the states of Rajasthan, Himachal Pradesh, Uttar Pradesh and Andhra Pradesh and consultancies under Green National Highways Corridor Projects (GNHCP) and balance activities related to National Highway Interconnectivity Improvement Project (NHIIP) funded by World Bank

12.

Dwarka Expressway Project — Package- I from Shiv Murti Intersection at Km 20 of NH 8 to Road Under Bridge (RUB) near Dwarka sector 21 (from Km 0.800 to 5+300) Delhi - Work Order for Safety Consultancy Services

Dwarka Expressway Project — Package- I from Shiv Murti Intersection at Km 20 of NH 8 to Road Under Bridge (RUB) near Dwarka sector 21 (from Km 0.800 to 5+300) Delhi - Work Order for Safety Consultancy Services

13.

Dwarka Expressway Project - Package II from Road Under Ridge (RUB) near Sector-21 Dwarka to Delhi Haryana Boarder (Km 5.300 To Km 9.500) at Delhi - Work Order for Safety Consultancy Services

Dwarka Expressway Project - Package II from Road Under Ridge (RUB) near Sector-21 Dwarka to Delhi Haryana Boarder (Km 5.300 To Km 9.500) at Delhi - Work Order for Safety Consultancy Services

14.

Safety Consultancy Services for Package 9 (Length=58.1 Km) including following projects in the State of Maharashtra (1) Construction of New 6-lane tunnel at Khamataki Ghat of NH-4 on EPC Mode (L=6.5 Km) (2) Integrated Infrastructure and Raod Development on NH-4 at Chandani Chowk (L=2.2 Km) (3) Dharampuri - Lonand, Pkg-IV (Sant Dyaneshwar Palkhi Marg) (L=49.4 Km.)

Safety Consultancy Services for Package 9 (Length=58.1 Km) including following projects in the State of Maharashtra (1) Construction of New 6-lane tunnel at Khamataki Ghat of NH-4 on EPC Mode (L=6.5 Km) (2) Integrated Infrastructure and Raod Development on NH-4 at Chandani Chowk (L=2.2 Km) (3) Dharampuri - Lonand, Pkg-IV (Sant Dyaneshwar Palkhi Marg) (L=49.4 Km.)

15.

Safety Consultancy Services for Package 10 (Length=247.2 Km) including following projects in the State of Maharashtra (1) Sant Dnyaneshwar Palkhi Marg (Section of NH-965): a) Mohol to Wakhari, Pkg-1 (L=44.7 Km), b) Wakhri to Khudus, Pkg-II (L=33.1 Km), c) Khudus to Dharmapuri, Pkg-III (L=39.2 Km) (2) Sant Tukaram Palakhi Marg: a) Patas - Vasunde to Baramati (Part of Sant Tukaram Palakhi Marg including Indapur Bypass) Pkg I (L=41.4 Km), b) Baramati - Indapur Package - II (L=42.1 Km), c) Indappur - Akluj - tondale - Bondale Package - III (L=46.7 Km)

Safety Consultancy Services for Package 10 (Length=247.2 Km) including following projects in the State of Maharashtra (1) Sant Dnyaneshwar Palkhi Marg (Section of NH-965): a) Mohol to Wakhari, Pkg-1 (L=44.7 Km), b) Wakhri to Khudus, Pkg-II (L=33.1 Km), c) Khudus to Dharmapuri, Pkg-III (L=39.2 Km) (2) Sant Tukaram Palakhi Marg: a) Patas - Vasunde to Baramati (Part of Sant Tukaram Palakhi Marg including Indapur Bypass) Pkg I (L=41.4 Km), b) Baramati - Indapur Package - II (L=42.1 Km), c) Indappur - Akluj - tondale - Bondale Package - III (L=46.7 Km)

16.

Design Safety Consultancy Services for “Formation of new six lane road from Punnapakkam (Design Chainage: Ch 35+000) to Thiruvallur Bypass (Design Chainage: Ch 47+800) with paved shoulders and two-lane service road on both sides in section 2 of Chennai Peripheral Ring Road under EPC mode

Design Safety Consultancy Services for “Formation of new six lane road from Punnapakkam (Design Chainage: Ch 35+000) to Thiruvallur Bypass (Design Chainage: Ch 47+800) with paved shoulders and two-lane service road on both sides in section 2 of Chennai Peripheral Ring Road under EPC mode

17.

Engagement of Safety Consultant Services during Operation and Maintenance of (i) Six laning & Strengthening of NH-248A From Existing Km 2+740 (Rajiv Chowk) to Km 11+682 in Gurugram on HAM in the state of Haryana (Package-I) (ii) Six laning & Strengthening of NH-248A from existing km. 11.682 to km. 24.536 (Design Ch. Km. 9.282 to km. 22.136) in the state of Haryana on HAM (Package-II) (iii) Delhi-Gurgaon section of NH-48 and other works along the project highway from km 11.060 to km 42.00 (Dhaula Kuan in Delhi to Kherki Dhaula Fee Plaza in Haryana)

Engagement of Safety Consultant Services during Operation and Maintenance of (i) Six laning & Strengthening of NH-248A From Existing Km 2+740 (Rajiv Chowk) to Km 11+682 in Gurugram on HAM in the state of Haryana (Package-I) (ii) Six laning & Strengthening of NH-248A from existing km. 11.682 to km. 24.536 (Design Ch. Km. 9.282 to km. 22.136) in the state of Haryana on HAM (Package-II) (iii) Delhi-Gurgaon section of NH-48 and other works along the project highway from km 11.060 to km 42.00 (Dhaula Kuan in Delhi to Kherki Dhaula Fee Plaza in Haryana)

18.

Safety Consultant for Delhi - Amritsar - Katra Expressway (Phase -I Pkg-V) from Km. 120+250 to K. 157+920 (Total Length - 37.67 Km.) in the State of Haryana

Safety Consultant for Delhi - Amritsar - Katra Expressway (Phase -I Pkg-V) from Km. 120+250 to K. 157+920 (Total Length - 37.67 Km.) in the State of Haryana

19.

Safety Consultant for 4 Laning of Dhillon Nagar (Moga) to Bajakhana (Lambawali) section of NH-105B, (Greenfield Alignment) from design Chainage Km. 0.000 to Km. 43.319 under Bharatmala Pariyjana in the State of Punjab on Hybrid Annuity Mode

Safety Consultant for 4 Laning of Dhillon Nagar (Moga) to Bajakhana (Lambawali) section of NH-105B, (Greenfield Alignment) from design Chainage Km. 0.000 to Km. 43.319 under Bharatmala Pariyjana in the State of Punjab on Hybrid Annuity Mode

20.

Consultancy services for Authority`s Engineer for suppervision of 6/8 laning of Port road connectivity Project JNPT Phase - II (Package-3) - Construction of NH-348 (Old SH-54) from Km. 7.422 to Km. 13.160 and Amra Marg from Km. 0.000 to Km. 5.360 the state of Maharashtra on EPC mode.

Consultancy services for Authority`s Engineer for suppervision of 6/8 laning of Port road connectivity Project JNPT Phase - II (Package-3) - Construction of NH-348 (Old SH-54) from Km. 7.422 to Km. 13.160 and Amra Marg from Km. 0.000 to Km. 5.360 the state of Maharashtra on EPC mode.

21.

Project Management Consultancy Services for upgradation to 2/4 lane with PS configuration of newly declared NH-516 B from its junction with NH -16 near Pendurthi connecting Kothavalasa, S. Kota and terminating at its junction with NH-516 E near Bowdara section the state of Andhra Pradesh for length of 40.20 Kms.

Project Management Consultancy Services for upgradation to 2/4 lane with PS configuration of newly declared NH-516 B from its junction with NH -16 near Pendurthi connecting Kothavalasa, S. Kota and terminating at its junction with NH-516 E near Bowdara section the state of Andhra Pradesh for length of 40.20 Kms.

22.

Consutancy services for Independent Engineer services for Package - II - Four Laning Byrapura to Challakere section of NH-150 A from Km. 308.550 to Km. 358.500 on HAM Mode under Bharatmala Pariyojana in the State of Karnataka.

Consutancy services for Independent Engineer services for Package - II - Four Laning Byrapura to Challakere section of NH-150 A from Km. 308.550 to Km. 358.500 on HAM Mode under Bharatmala Pariyojana in the State of Karnataka.

23.

Consultancy Services for Authrity`s Engineer for Supervision of "Six Laning of Tuticorin Port Road section of NH-7A (New NH-138) from Km. 0.000 to Km. 6.140 (Effective Length 5.16 Km) on EPC Mode in the state of Tamil Nadu on EPC Mode.

Consultancy Services for Authrity`s Engineer for Supervision of "Six Laning of Tuticorin Port Road section of NH-7A (New NH-138) from Km. 0.000 to Km. 6.140 (Effective Length 5.16 Km) on EPC Mode in the state of Tamil Nadu on EPC Mode.

24.

Consultancy Services for Authority`s Engineer for Supervision of "Construction of four lane with paved shoulder Agartala Bypass (Western side, length 25.402 km) connecting NH-8 (near Amtali) to Nh-108B (near Lembuchhera) in the state of Tipura on EPC basis

Consultancy Services for Authoritys Engineer for Supervision of - Construction of four lane with paved shoulder Agartala Bypass (Western side, length 25.402 km) connecting NH-8 (near Amtali) to Nh-108B (near Lembuchhera) in the state of Tipura on EPC basis

25.

Independent Engineer Services for Construction of "Four Laning of NH 530 B from Devinagar Bypass (End) (Existing Km. 208.000 of NH 530 B / Design Km. 66.000) to Kasganj Bypass (End) Existing Km. 150.100 of NH 530 B / Design Km. 123.100) in the State of Uttar Pradesh on HAM mode.

Independent Engineer Services for Construction of "Four Laning of NH 530 B from Devinagar Bypass (End) (Existing Km. 208.000 of NH 530 B / Design Km. 66.000) to Kasganj Bypass (End) Existing Km. 150.100 of NH 530 B / Design Km. 123.100) in the State of Uttar Pradesh on HAM mode.

26.

Consultancy Services for preparation of Detailed Project Report for "Feasibility study and preparation of DPR for Construction of (1) Construction of 6 Lanes elevated corridor and development of road from ITI Tiraha to Anna Nagar upto Kasturba Nagar (Chetak Bridge) in Bhopal city (Length - 3 Km. approx.) Missing link of NH 46 (Old NH-12) Length cost Rs. 375 Cr. 2. Construction of 6 lanes elevated corridor and development of existing 4 lane road from Prabhat Chourah to Ratnagiri Tiraha from Km. 3+900 to Km. 8+900 in Bhopal city (length - 5.00 Km. approx.) NH-146 (Old NH-86) with service roads cost Rs. 700 Cr. 3. Construction of 6 lanes elevated corridor and development of road from Gautam Nagar to ISBT Kamla Pati railway station upto Veersawarker setu in Bhopal city (Length - 3.5 Km. approx.) missing link of NH-46 (Old NH-12) cost Rs. 437.5 Cr. 4. Construction of 6 lanes elevated corridor and development of existing 4 lane road including service road from start of CRRIAMPRI to the end of BRTS corridor (Misrod) section of NH-46 (old NH-12) (length 6.7 Km.) cost Rs. 900 Cr. Total Length 18.20 Kms. and Total Cost Rs. 2413 Cr. inthe State of Madhya Pradesh.

Consultancy Services for preparation of Detailed Project Report for "Feasibility study and preparation of DPR for Construction of (1) Construction of 6 Lanes elevated corridor and development of road from ITI Tiraha to Anna Nagar upto Kasturba Nagar (Chetak Bridge) in Bhopal city (Length - 3 Km. approx.) Missing link of NH 46 (Old NH-12) Length cost Rs. 375 Cr. 2. Construction of 6 lanes elevated corridor and development of existing 4 lane road from Prabhat Chourah to Ratnagiri Tiraha from Km. 3+900 to Km. 8+900 in Bhopal city (length - 5.00 Km. approx.) NH-146 (Old NH-86) with service roads cost Rs. 700 Cr. 3. Construction of 6 lanes elevated corridor and development of road from Gautam Nagar to ISBT Kamla Pati railway station upto Veersawarker setu in Bhopal city (Length - 3.5 Km. approx.) missing link of NH-46 (Old NH-12) cost Rs. 437.5 Cr. 4. Construction of 6 lanes elevated corridor and development of existing 4 lane road including service road from start of CRRIAMPRI to the end of BRTS corridor (Misrod) section of NH-46 (old NH-12) (length 6.7 Km.) cost Rs. 900 Cr. Total Length 18.20 Kms. and Total Cost Rs. 2413 Cr. inthe State of Madhya Pradesh.

27.

Independent Engineer Services for Four Laning of Nh-39 (old NH-75) from design Km. 97+600 (Existing Km. 96+470) (Udaipur village) to design Km. 147+540 (existing Km. 148.020) (Bhogu Village) in the State of Jharkhand on Hybrid Annuity Mode, (Package-II)

Independent Engineer Services for Four Laning of Nh-39 (old NH-75) from design Km. 97+600 (Existing Km. 96+470) (Udaipur village) to design Km. 147+540 (existing Km. 148.020) (Bhogu Village) in the State of Jharkhand on Hybrid Annuity Mode, (Package-II)

28.

Preparation of Feasibility Study and Detailed Project Report for construction to 2 Lane with paved shoulder through Green Field from Vishwanathpur to Kharka Basant ( New NH-122 A) with Land Acquisition of Sitamarhi district in Bihar. (Job No. Nh122A-2022-23-BR-59).

Preparation of Feasibility Study and Detailed Project Report for construction to 2 Lane with paved shoulder through Green Field from Vishwanathpur to Kharka Basant ( New NH-122 A) with Land Acquisition of Sitamarhi district in Bihar. (Job No. Nh122A-2022-23-BR-59).

29.

Consultancy Servies for DPR preparation of Giridih Bypass on NH-114A including Land Acquisition and Utility Shifting.

Consultancy Servies for DPR preparation of Giridih Bypass on NH-114A including Land Acquisition and Utility Shifting.

30.

Preparation of Feasibility Study/ Detailed Project Report of selected state road stretches for NH connectivity to Backward Areas/Religious/Tourist Places (BR) Scheme - Hospet (NH-67) - Hampi - Kamlapu - Gangavathi (Package - NHAI/T/7)

Preparation of Feasibility Study/ Detailed Project Report of selected state road stretches for NH connectivity to Backward Areas/Religious/Tourist Places (BR) Scheme - Hospet (NH-67) - Hampi - Kamlapu - Gangavathi (Package - NHAI/T/7)

31.

Engaging Technical Consultant for Prepration of Feasibility Study (FS) and Detailed Project Report (DPR) on EPC mode for widening / improvement of existing road Chakpikrong - Sajik - Tampak - Aigong - Khongtal to NHSL specifictaion (42 Km), construction of road Khemdo - Phaisanjang (Green Field alignment) to NHSL specification (25.9 Km) & Chakpikrong - Joupi (Green Field Alignment) to NHSL specifications (28 Km) under project SEWAK in Manipur State (Total Length 95.90 Km).

Engaging Technical Consultant for Prepration of Feasibility Study (FS) and Detailed Project Report (DPR) on EPC mode for widening / improvement of existing road Chakpikrong - Sajik - Tampak - Aigong - Khongtal to NHSL specifictaion (42 Km), construction of road Khemdo - Phaisanjang (Green Field alignment) to NHSL specification (25.9 Km) & Chakpikrong - Joupi (Green Field Alignment) to NHSL specifications (28 Km) under project SEWAK in Manipur State (Total Length 95.90 Km).

32.

Preparation of Detailed Project Report for New Alignment for 2 lanes/2lane with paved shoulders configuration of stretch from Km. 95.200 near S.S.B. Camp (Ausani Village) to near UP Boarder on NH-727 – in the boundary zone of Valmiki Wildlife Sanctuary & Tiger Reserve & Tiger Reserve along Gandak River bank in Bihar State.

Preparation of Detailed Project Report for New Alignment for 2 lanes/2lane with paved shoulders configuration of stretch from Km. 95.200 near S.S.B. Camp (Ausani Village) to near UP Boarder on NH-727 – in the boundary zone of Valmiki Wildlife Sanctuary & Tiger Reserve & Tiger Reserve along Gandak River bank in Bihar State.

33.

Consultancy Services for preparation of Detailed Project Report (DPR) for decongestion / bypass of NH-515 in Pasighat town (approx. 10Km) under Road Safety in the State of Arunachal Pradesh

Consultancy Services for preparation of Detailed Project Report (DPR) for decongestion / bypass of NH-515 in Pasighat town (approx. 10Km) under Road Safety in the State of Arunachal Pradesh

34.

Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at (i) Nainital- Bhavali Road Cantonment Board Land, Nainital (ii) Nainital - Haldwani Road near Rajkiya Vaidhshala, first Bend, Nainital in the State of Uttarakhand

Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at (i) Nainital- Bhavali Road Cantonment Board Land, Nainital (ii) Nainital - Haldwani Road near Rajkiya Vaidhshala, first Bend, Nainital in the State of Uttarakhand

35.

Package -3/ Corridors Consultancy Services for Feasibility Study and Detailed Project Report for improvement and up-gradation oto 2-Lane with paved shoulder/ 4 - lane configuration of proposed Corridor from (i) Jharkhand Central Corridor : - Ranchi - Kathitanr - Thakurgaon -Burhmu - Tandwa - Chatra - Hunterganj Bihar Border Highway Corridor (ii) Tourist Corridor :- Milan Chowk - Sarjamdih -Tamar - Khunti - - Govindpur - Sisai - Ghaghra - Netarhat - Garu - Saryu - Latehar - Herhanj - Balumath - Mcluskiganj - Chama More Highway Corridor.

Package -3/ Corridors Consultancy Services for Feasibility Study and Detailed Project Report for improvement and up-gradation oto 2-Lane with paved shoulder/ 4 - lane configuration of proposed Corridor from (i) Jharkhand Central Corridor : - Ranchi - Kathitanr - Thakurgaon -Burhmu - Tandwa - Chatra - Hunterganj Bihar Border Highway Corridor (ii) Tourist Corridor :- Milan Chowk - Sarjamdih -Tamar - Khunti - - Govindpur - Sisai - Ghaghra - Netarhat - Garu - Saryu - Latehar - Herhanj - Balumath - Mcluskiganj - Chama More Highway Corridor.

36.

Consultancy Services for Preparation and finalization of Detailed Project Report for the project NSK-II (28) under Hybrid Annuity Model Program Phase -II - (i). 28 A - Bambhori Nimkhedi Jalgaon Asoda Raod MDR-59 (ii) 28 B - Jalgaon Mamurabad Vidgaon Kingaon Indore raod (iii) 28 C - Pachora Wadi Satgaon raod Sh - 40 Km. 94/600 to 115/350 Ta. Pachora (iv) 28 D - Amlad Mod Borad Tanradi Shahada Sangvi Hated Amalner road

Consultancy Services for Preparation and finalization of Detailed Project Report for the project NSK-II (28) under Hybrid Annuity Model Program Phase -II - (i). 28 A - Bambhori Nimkhedi Jalgaon Asoda Raod MDR-59 (ii) 28 B - Jalgaon Mamurabad Vidgaon Kingaon Indore raod (iii) 28 C - Pachora Wadi Satgaon raod Sh - 40 Km. 94/600 to 115/350 Ta. Pachora (iv) 28 D - Amlad Mod Borad Tanradi Shahada Sangvi Hated Amalner road

37.

Consultancy Services for Preparation and finalization of Detailed Project Report for the project NSK-II (20) under Hybrid Annuity Model Program Phase -II. (i) NSK-II (20A) - Reola - Nandagaon Pilakhod SH- 25, (ii) NSK -II (20 B) - Vani Dhodambe Vadalibhoi Bhoyegaon Dighghvad Salsane Talegaon Rohi Road

Consultancy Services for Preparation and finalization of Detailed Project Report for the project NSK-II (20) under Hybrid Annuity Model Program Phase -II. (i) NSK-II (20A) - Reola - Nandagaon Pilakhod SH- 25, (ii) NSK -II (20 B) - Vani Dhodambe Vadalibhoi Bhoyegaon Dighghvad Salsane Talegaon Rohi Road

38.

Consultancy Services for Preparation and finalization of Detailed Project Report for the project NSK-II (21) under Hybrid Annuity Model Program Phase - II. (i) NSK-II (21 A) - Ahava - Tarahabad - Nampur - Lakhmanpur - Manamad road, (ii) NSK-II (21 B) - Nandurbar Chhadavel, Nampur - Malegaon Manmad Yevola Kopargaon Rohuri Nagar Kamla Temburni Pandharpur Malgalvedha river Bombalad to state border SMS - 8, (iii) NSK-III (21 C) Strengthening and Widening of Satana Ajmer Saundane Ravalgaon Ajang Zodge Raod, (iv) NSK-II (21D) - Borgaon Palsadar Tirhale Pale Br. Manur Kalwan to (SH-27) Road MDR-8

Consultancy Services for Preparation and finalization of Detailed Project Report for the project NSK-II (21) under Hybrid Annuity Model Program Phase - II. (i) NSK-II (21 A) - Ahava - Tarahabad - Nampur - Lakhmanpur - Manamad road, (ii) NSK-II (21 B) - Nandurbar Chhadavel, Nampur - Malegaon Manmad Yevola Kopargaon Rohuri Nagar Kamla Temburni Pandharpur Malgalvedha river Bombalad to state border SMS - 8, (iii) NSK-III (21 C) Strengthening and Widening of Satana Ajmer Saundane Ravalgaon Ajang Zodge Raod, (iv) NSK-II (21D) - Borgaon Palsadar Tirhale Pale Br. Manur Kalwan to (SH-27) Road MDR-8

39.

Consultancy Services for Preparation and finalization of Detailed Project Report for the project KN-II (5) under Hybrid Annuity Model Program Phase - II. (i) KN-II (5A) - Improvement of A) Matheran reral Kalamb road SH-109 Km. 0/00 to 20/400, B) Labhyachiwadi sugve pimpaloli neral road MDR 104 Km. 3/00 to 14/00. (ii) KN-II (5B) - Cpmstruction of Concrete Pavement Raod & Reconstruction & widening of Bridges & culverts for i) Karlekhind Shiravali MDR-35 Km. 0/00 to 7/700, ii) Mandvaphata to Mandav Jetty SH-87 Km. 0/00 to 2/700 , iii) Karlekhind to Thal Vaishet Raod SH-89 Km. 0/00 to 7/00, iv) Shiravali Saral to Mandvaphata to Alibag Bypass road (Pen Raod Junction) MSH-4 Km. 235/830 to 262/500. (II) KN-II (5C) - Construction of Concrete Pavement Raod & Reconstruction & widening of Bridges & Culverts for i) Alibag Bypass raod (Pen Raod Junction) to Albag Roha Junction to Belkade to Garudpada Nagaon Hatale to Redanda Bridge Raod MSH-4 Km. 262/500 to 280/745, ii) Revdanda Bridge to Salav to Talekhar Road SH-92 Km. 0/00 to 13/00 total length 31.245 Km. & Construction of New Revdnada Major Creek Bridge.

Consultancy Services for Preparation and finalization of Detailed Project Report for the project KN-II (5) under Hybrid Annuity Model Program Phase - II. (i) KN-II (5A) - Improvement of A) Matheran reral Kalamb road SH-109 Km. 0/00 to 20/400, B) Labhyachiwadi sugve pimpaloli neral road MDR 104 Km. 3/00 to 14/00. (ii) KN-II (5B) - Cpmstruction of Concrete Pavement Raod & Reconstruction & widening of Bridges & culverts for i) Karlekhind Shiravali MDR-35 Km. 0/00 to 7/700, ii) Mandvaphata to Mandav Jetty SH-87 Km. 0/00 to 2/700 , iii) Karlekhind to Thal Vaishet Raod SH-89 Km. 0/00 to 7/00, iv) Shiravali Saral to Mandvaphata to Alibag Bypass road (Pen Raod Junction) MSH-4 Km. 235/830 to 262/500. (II) KN-II (5C) - Construction of Concrete Pavement Raod & Reconstruction & widening of Bridges & Culverts for i) Alibag Bypass raod (Pen Raod Junction) to Albag Roha Junction to Belkade to Garudpada Nagaon Hatale to Redanda Bridge Raod MSH-4 Km. 262/500 to 280/745, ii) Revdanda Bridge to Salav to Talekhar Road SH-92 Km. 0/00 to 13/00 total length 31.245 Km. & Construction of New Revdnada Major Creek Bridge.

40.

Consultancy Services for Preparation of Detailed Project Report for Construction of `Tungri - Mathow - Dubbin - Dishing - Debrik` road approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total Length 84.00 Km. ) (Package-I)

Consultancy Services for Preparation of Detailed Project Report for Construction of `Tungri - Mathow - Dubbin - Dishing - Debrik` road approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total Length 84.00 Km. ) (Package-I)

41.

Selection of Feasibility Consultant for Preparation of Detailed Feasibility Report for up-gradation of Pukhrayan - Ghatampur - Bindaki Road (SH-46) including Sikandra to Bhoginipur (SH-112), Length 109.54 Km. in Uttar Pradesh.

Selection of Feasibility Consultant for Preparation of Detailed Feasibility Report for up-gradation of Pukhrayan - Ghatampur - Bindaki Road (SH-46) including Sikandra to Bhoginipur (SH-112), Length 109.54 Km. in Uttar Pradesh.

42.

Consultancy Services for Authority`s Engineer for Supervision of two lane with hard shoulders of Chakabama - Sunheboto Road from (1) Design Km. 50.000 to Km. 75.000 (Existing Km. 52.370 to Km. 79.040) (ii) Design Km. 75.000 to Km. 95.000 (Existing Km. 79.040 to Km. 100.345) (iii) Design Km. 95.000 to Km. 115.534 ( Existing Km. 100.345 to Km. 122.250)" in the State of Nagaland under SARDP - NE on EPC Mode.

Consultancy Services for Authority`s Engineer for Supervision of two lane with hard shoulders of Chakabama - Zunheboto Road from (1) Design Km. 50.000 to Km. 75.000 (Existing Km. 52.370 to Km. 79.040) (ii) Design Km. 75.000 to Km. 95.000 (Existing Km. 79.040 to Km. 100.345) (iii) Design Km. 95.000 to Km. 115.534 ( Existing Km. 100.345 to Km. 122.250)" in the State of Nagaland under SARDP - NE on EPC Mode.
43.

Consultancy Services for Authority`s Engineer for Supervision of "Two Lane with hard shoulders of Merangkong - Tamlu - Mon Road from : (i) Design Km. 0.000 to Km. 20.000 (existing Km. 0.000 to Km. 20.456) (ii) Design Km. 20.00 to Km. 40.000 (Existing Km. 20. 456 to Km. 41.065) (iii) Desing Km. 40.000 to Km. 59.000 (Existing Km. 41.065 to Km. 60.345) (iv) DEsing Km. 59.000 to Km. 86.835 (Existing Km. 60.345 to Km. 98.065)" in the State of Nagaland under SARDP - NE on EPC Mode.

Consultancy Services for Authority`s Engineer for Supervision of "Two Lane with hard shoulders of Merangkong - Tamlu - Mon Road from : (i) Design Km. 0.000 to Km. 20.000 (existing Km. 0.000 to Km. 20.456) (ii) Design Km. 20.00 to Km. 40.000 (Existing Km. 20. 456 to Km. 41.065) (iii) Desing Km. 40.000 to Km. 59.000 (Existing Km. 41.065 to Km. 60.345) (iv) DEsing Km. 59.000 to Km. 86.835 (Existing Km. 60.345 to Km. 98.065)" in the State of Nagaland under SARDP - NE on EPC Mode.

44.

Consultancy Services for Authority`s Engineer for Supervision of "Two Lane with Hard shoulders of Pfutsero - Phek Road from (i) Design Km. 0.000 to Km. 20.000 (existing Km. 0.000 to Km. 19.900) (ii) Desing Km. 20.000 to Km. 40.000 (Existing Km. 19.900 to Km. 40.090) (iii) Design km. 40.000 to Km. 62.558 (Existing Km. 40.090 to Km. 65.300)" in the state of Nagaland under SARDP -NE on EPC Mode.

Consultancy Services for Authority`s Engineer for Supervision of "Two Lane with Hard shoulders of Pfutsero - Phek Road from (i) Design Km. 0.000 to Km. 20.000 (existing Km. 0.000 to Km. 19.900) (ii) Desing Km. 20.000 to Km. 40.000 (Existing Km. 19.900 to Km. 40.090) (iii) Design km. 40.000 to Km. 62.558 (Existing Km. 40.090 to Km. 65.300)" in the state of Nagaland under SARDP -NE on EPC Mode.

45.

Independent Engineer Services for Rehabilitation and Upgradation to Four Lane configuration & Strengthening of Sihuni to Rajol from Km. 51.000 to Km. 72.000 of NH-20 (New NH-154) (Design Length 18.450 Km) of Pathankot - Mandi Section under NH(O) in HP on HAM basis (Package -II A) (UPC: N/08033/02002/HP) Roads & Highway On going

Independent Engineer Services for Rehabilitation and Upgradation to Four Lane configuration & Strengthening of Sihuni to Rajol from Km. 51.000 to Km. 72.000 of NH-20 (New NH-154) (Design Length 18.450 Km) of Pathankot - Mandi Section under NH(O) in HP on HAM basis (Package -II A) (UPC: N/08033/02002/HP) Roads & Highway On going

46.

Consultancy Services for Authority`s Engineer for Construction of 6-lane Durg - Raipur - Arang bypass section of NH-53 from Design Ch. 0+000 (Vill. Tendesara) to Design Ch. 44+500 (Vill. Parsada) in the state of Chhattisgarh on EPC Mode under Bharatmala (Package -I)

Consultancy Services for Authority`s Engineer for Construction of 6-lane Durg - Raipur - Arang bypass section of NH-53 from Design Ch. 0+000 (Vill. Tendesara) to Design Ch. 44+500 (Vill. Parsada) in the state of Chhattisgarh on EPC Mode under Bharatmala (Package -I)

47.

Consultancy Services of Authority`s Engineer for Supervision of Construction of Emergency Laning facility on National Highwasy - Development of emergency landing facility on Balasore - Kharagpur section from Km. 83.400 to Km. 88.400 (Total 5 Km) of NH-60) New Nh-16) inthe State of West Bengal on EPC Mode.

Consultancy Services of Authority`s Engineer for Supervision of Construction of Emergency Laning facility on National Highwasy - Development of emergency landing facility on Balasore - Kharagpur section from Km. 83.400 to Km. 88.400 (Total 5 Km) of NH-60) New Nh-16) inthe State of West Bengal on EPC Mode.

48.

Consultancy Services for Authority`s Engineer for Supervision Rehabilitation and Upgradation of Jamkhed to Sautada section of NH-548D (From Km. 195. to Km. 208.774, Length - 13.399 Km) to 2 L + PS/4L configuration with rigid pavement in the State of Maharashtra on EPC mode.

Consultancy Services for Authority`s Engineer for Supervision Rehabilitation and Upgradation of Jamkhed to Sautada section of NH-548D (From Km. 195. to Km. 208.774, Length - 13.399 Km) to 2 L + PS/4L configuration with rigid pavement in the State of Maharashtra on EPC mode.

49.

Authority`s Engineer for Supervision of Rehabilitation & Upgradation of Kopargaon to Savali Vihir section (from Km. 354.00 to Km. 362.663 total length - 8.663 L of NH-752g to 4L+PS in the State of Maharashtra on EPC mode.

Authority`s Engineer for Supervision of Rehabilitation & Upgradation of Kopargaon to Savali Vihir section (from Km. 354.00 to Km. 362.663 total length - 8.663 L of NH-752g to 4L+PS in the State of Maharashtra on EPC mode.

50.

Consultancy Serices for Authority`s Engineer for Construction of 6-Lane Durg - Raipur - Arang Bypass section of NH-53 from Design Ch. 44+500 (Vill. Parsaa) to Design Ch. 92_230 (Vill. Paragaon) in the state of Chhattisgarh on EPC Mode under Bharatmala (Package - II)

Consultancy Serices for Authority`s Engineer for Construction of 6-Lane Durg - Raipur - Arang Bypass section of NH-53 from Design Ch. 44+500 (Vill. Parsaa) to Design Ch. 92_230 (Vill. Paragaon) in the state of Chhattisgarh on EPC Mode under Bharatmala (Package - II)

51.

Consultancy Services for Authority`s Engineer for Supervision of Rehabilitation & UP-gradation to 2 L+PS/4 L to Nhavara to Chaufula section of NH - 548 DG I.e. (Nhavara to Chaufula Section) Ch. 0/000 to Km. 24/037 of state highway in the state of Maharashtra on EPC Mode (Length 24.037 Km).

Consultancy Services for Authority`s Engineer for Supervision of Rehabilitation & UP-gradation to 2 L+PS/4 L to Nhavara to Chaufula section of NH - 548 DG I.e. (Nhavara to Chaufula Section) Ch. 0/000 to Km. 24/037 of state highway in the state of Maharashtra on EPC Mode (Length 24.037 Km).

52.

Consultancy Services for Authority`s Engineer for supervision of (i) Rehabilitation and up-Gradation to Two lane with paved shoulders of Rajewadi to Warndh village section (Km. 75.100 to 88.100) Part of Lonand - Bhor - Mahad - Mhapral - Mandangad - Pachral - Ambadave, NH-965 DD and (ii) Construction of Major High Level Bridges across Panvel - Mahad - Panjim Road Nh-66 (Old 17) at Km. 91/400 God River, 94/400 Kal river & Km. 161/400 Choradi River in Raigad Distrct in the State of Maharashtra on EPC Mode."

Consultancy Services for Authority`s Engineer for supervision of (i) Rehabilitation and up-Gradation to Two lane with paved shoulders of Rajewadi to Warndh village section (Km. 75.100 to 88.100) Part of Lonand - Bhor - Mahad - Mhapral - Mandangad - Pachral - Ambadave, NH-965 DD and (ii) Construction of Major High Level Bridges across Panvel - Mahad - Panjim Road Nh-66 (Old 17) at Km. 91/400 God River, 94/400 Kal river & Km. 161/400 Choradi River in Raigad Distrct in the State of Maharashtra on EPC Mode."

53.

Consultancy Services of Authority's Engineer for upgradation of existing 4 lane Ismailabad - Ambala section of NH-152 (Km. 0+000 to Km. 42+500) (Part of Ambala - Kotputli Corridor) to 4 -Lane access Controlled Stretch by providing grade separated structures and service/Slip roads under Bharatmala Pariyojana-I in the state of Haryana on EPC Mode.

Consultancy Services of Authoritys Engineer for upgradation of existing 4 lane Ismailabad - Ambala section of NH-152 (Km. 0+000 to Km. 42+500) (Part of Ambala - Kotputli Corridor) to 4 -Lane access Controlled Stretch by providing grade separated structures and service/Slip roads under Bharatmala Pariyojana-I in the state of Haryana on EPC Mode.
54.

Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at (i) Near GMVN Guest House, Nala Guptkashi (NH-109) (ii) Near Sersi (NH-109), Ukhimath (iii) Gangnani Hot Water Spring (NH-34), Uttarkashi and (iv) Gangotri Dham (NH-34) Uttarkashi in the State of Uttrakhand.

Consultancy Services for Preparation of Detailed Project Report for Tunnel Car Parking at (i) Near GMVN Guest House, Nala Guptkashi (NH-109) (ii) Near Sersi (NH-109), Ukhimath (iii) Gangnani Hot Water Spring (NH-34), Uttarkashi and (iv) Gangotri Dham (NH-34) Uttarkashi in the State of Uttrakhand.
55.

Independent Engineer service for Construction of 4-Lane Access Controlled Greenfiled Highway section on NH-163G (Khammam - Vijaywada) from V. Venkatayapalem village at Design Ch. 220.480 Km. to Brahamanapalli (K) Village at Design Ch. 250.400 Km (Total Length 29.920 Km) under other Economic Corridor (NH (o)) programme on Hybrid Annuity Mode in the State of Telangana (Package-I).

Independent Engineer service for Construction of 4-Lane Access Controlled Greenfiled Highway section on NH-163G (Khammam - Vijaywada) from V. Venkatayapalem village at Design Ch. 220.480 Km. to Brahamanapalli (K) Village at Design Ch. 250.400 Km (Total Length 29.920 Km) under other Economic Corridor (NH (o)) programme on Hybrid Annuity Mode in the State of Telangana (Package-I).
56.

Independent Engineering services for four Laning of Abohar (Design Chainage 75.500, Existing Km. 49+070 of NH-07) to Fazilka (design chainage 114.080, Existing Km. 80+655 of SH-20) and constructon of 4-Lane Greenfield highway of Abohar bypass (From design Chainage 0.000, Existing Km. 58_230, Malout - Abohar Road on NH-07 to Design chainage 6.380, Existing Km. 42+305, Abohar - Fazilka Road on NH-07) Total design length = 44.96 Km) on HAM Mode in the state of Punjab under Bharatmala Pariyojana (Tender ID 2023_NHAI_141498_1).

Independent Engineering services for four Laning of Abohar (Design Chainage 75.500, Existing Km. 49+070 of NH-07) to Fazilka (design chainage 114.080, Existing Km. 80+655 of SH-20) and constructon of 4-Lane Greenfield highway of Abohar bypass (From design Chainage 0.000, Existing Km. 58_230, Malout - Abohar Road on NH-07 to Design chainage 6.380, Existing Km. 42+305, Abohar - Fazilka Road on NH-07) Total design length = 44.96 Km) on HAM Mode in the state of Punjab under Bharatmala Pariyojana (Tender ID 2023_NHAI_141498_1).
57.

Consultancy Services of Authority's Engineer for Long Term Rectification of MoRT&H identified Blackspots (17 Nos.) & removal of 2 At- Grade Junctions and allied works on existing 4/6 - Lane Hyderabad - Vijayawada Section of Nh-65 from Km. 40.000 to Km. 221.500 in the state of Telangana on EPC Mode.

Consultancy Services of Authoritys Engineer for Long Term Rectification of MoRT&H identified Blackspots (17 Nos.) & removal of 2 At- Grade Junctions and allied works on existing 4/6 - Lane Hyderabad - Vijayawada Section of Nh-65 from Km. 40.000 to Km. 221.500 in the state of Telangana on EPC Mode.
58.

Authority's Engineer Services for Development, Upgradation and Maintenance of Bikaner - Napasar - Jasrasar section of (SH-20B) from Km. 5.800 to Km. 71.000 having total length of 65.525 Km. in Bikaner district of Rajasthan under RSHSP-II, on EPC mode (Package No. WB/RSHDP-II/Tr.01/EPC/AE/03) Notification for intention to Award as per ITC Clause 29.

Authoritys Engineer Services for Development, Upgradation and Maintenance of Bikaner - Napasar - Jasrasar section of (SH-20B) from Km. 5.800 to Km. 71.000 having total length of 65.525 Km. in Bikaner district of Rajasthan under RSHSP-II, on EPC mode (Package No. WB/RSHDP-II/Tr.01/EPC/AE/03) Notification for intention to Award as per ITC Clause 29.
59.

Consultancy Services for Authority's Engineer for Supervision of Rehabilitation & Upgradation of Hoshiarpur to Una up to PB/HP border section of NH-503A to 2 Lane paved shoulder configuration (from Design Chainage Km. 15+200 to Design Chainage Km. 30+348) & construction of 4 lane Hoshiarpur Bypass (from Design Chainage Km. 2+425 to Design Chainage Km. 15+200) (Total Length: 27.923 Kms) in the State of Punjab (Package-IV) under NH(O) on EPC Mode (Tender ID: 2023_NHAI_145698_1).

Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation & Upgradation of Hoshiarpur to Una up to PB/HP border section of NH-503A to 2 Lane paved shoulder configuration (from Design Chainage Km. 15+200 to Design Chainage Km. 30+348) & construction of 4 lane Hoshiarpur Bypass (from Design Chainage Km. 2+425 to Design Chainage Km. 15+200) (Total Length: 27.923 Kms) in the State of Punjab (Package-IV) under NH(O) on EPC Mode (Tender ID: 2023_NHAI_145698_1).
60.

Supervision & Quality Control Consultancy for works under Pradhan Mantri Gram Sadak Yojna - III (Batch -I) FDR & MPRCP/WB & other schemes, Distt. Sheopur PIU - Sheopur Package No. PMGSY-III/74 (Nodal PIU - Sheopur)

Supervision & Quality Control Consultancy for works under Pradhan Mantri Gram Sadak Yojna - III (Batch -I) FDR & MPRCP/WB & other schemes, Distt. Sheopur PIU - Sheopur Package No. PMGSY-III/74 (Nodal PIU - Sheopur)
61.

Consultancy services for preparation of detailed project Report (DPR ) for widening of existing single/Intermediate lane to 2-lane with paved shoulder from Km. 175.00 to 311.00 (Bataghat to Maletha) on NH-707A in the state of uttarakhand.

Consultancy services for preparation of detailed project Report (DPR ) for widening of existing single/Intermediate lane to 2-lane with paved shoulder from Km. 175.00 to 311.00 (Bataghat to Maletha) on NH-707A in the state of uttarakhand.
62.

Rehabilitation and upgrading to 2 Lanes/ 2 lane with paved shoulders/ 4 lane configuration from single/intermediate lane and strengthening of stretches of various National Highways in the states of Rajasthan, Himachal Pradesh , Uttar Pradesh and Andhra Pradesh and consultancies under Green National Highways Corridor Projects (GNHCP) and balance activities related to National Highway Interconnectivity Improvement Project (NHIIP).

Rehabilitation and upgrading to 2 Lanes/ 2 lane with paved shoulders/ 4 lane configuration from single/intermediate lane and strengthening of stretches of various National Highways in the states of Rajasthan, Himachal Pradesh , Uttar Pradesh and Andhra Pradesh and consultancies under Green National Highways Corridor Projects (GNHCP) and balance activities related to National Highway Interconnectivity Improvement Project (NHIIP).
63.

Consultancy Services for preparation of Feasibility study and detailed project report for construction of NH-133 section from Ekchari to Mahagama (Tentative length 40 Km) in the State of Jharkhand.

Consultancy Services for preparation of Feasibility study and detailed project report for construction of NH-133 section from Ekchari to Mahagama (Tentative length 40 Km) in the State of Jharkhand.
64.

Consultancy Services for preparation of Feasibility Study and detailed project report for up gradation of NH-80 section from Km. 190.00 to Km. 215.00 into four laning including Shibganj bypass (between Km. 197.00 to Km. 207.00) and from Km. 260.00 to Km. 283.00 in the State of Jharkhand.

Consultancy Services for preparation of Feasibility Study and detailed project report for up gradation of NH-80 section from Km. 190.00 to Km. 215.00 into four laning including Shibganj bypass (between Km. 197.00 to Km. 207.00) and from Km. 260.00 to Km. 283.00 in the State of Jharkhand.
65.

Consultancy Services for preparation of detailed project report (DPR) for construction of Srinagar bypass from Panch - Peepal to Sweet bridge in 2- lane with paed shoulder on NH-58 in the state of Uttarakhand.

Consultancy Services for preparation of detailed project report (DPR) for construction of Srinagar bypass from Panch - Peepal to Sweet bridge in 2- lane with paed shoulder on NH-58 in the state of Uttarakhand.
66.

Preparation of Detailed Project Report and Bid Process Management for transforming the existing Roads to Smart Urban Roads in Chennai City - Sub-consulting contract document for Demarcating existing Right of Way for Three Corridors.

Preparation of Detailed Project Report and Bid Process Management for transforming the existing Roads to Smart Urban Roads in Chennai City - Sub-consulting contract document for Demarcating existing Right of Way for Three Corridors.
67.

Consultancy Services for Preparation of DPR for "4-Laning from Km. 0.000 to Km. 68.000 (Old Chainage Km. 197.300 to Km. 265.300) of Kanaktora - Jharsugua Section of NH-49 in the State of Odisha

Consultancy Services for Preparation of DPR for "4-Laning from Km. 0.000 to Km. 68.000 (Old Chainage Km. 197.300 to Km. 265.300) of Kanaktora - Jharsugua Section of NH-49 in the State of Odisha
68.

"Consultancy Services for the Authority’s Engineer for 1. Widening/Improvement to 4(Four) Lane with Paved Shoulder from KM 626+030 (Nalani-Hulla Gaon) to KM 650+450 (Chotahapjan) on existing Tinsukhia-Makum bypass of NH-15 (Old NH 37) and Improvement of existing NH-315 (Old NH-38) from km 0+000 (Chotahapjan) to km 16+900 (Bogapani section) (2-Lane+PS) in the State of Assam on EPC mode. (package-3) 2. Strengthening/Improvement to 2-lane with Paved Shoulder from km 16+900 (Bogapani) to km 27+150 (Golai gaon) on existing Dibrugarh to Ledo section with proposed Digboi Bypass (Green Field and Brown Field) (2 Lane+PS) of NH-315 (Old NH-38) in Tinsukhia District in the state of Assam on EPC mode (Package -4) 3. Strengthening / Improvement to 2-Lane with Paved Shoulder from km 27+150 (Golai Gaon) to km 47+682 (Ledo) on existing Dibrugah to Ledo section with proposed Digboi Bypass (Green field and Brownfield) (2-Lane+PS) of NH-315 (Old NH-38) in Tinsukhia District in the State of Assam on EPC Mode. Package -5) 2nd Call"

"Consultancy Services for the Authority’s Engineer for 1. Widening/Improvement to 4(Four) Lane with Paved Shoulder from KM 626+030 (Nalani-Hulla Gaon) to KM 650+450 (Chotahapjan) on existing Tinsukhia-Makum bypass of NH-15 (Old NH 37) and Improvement of existing NH-315 (Old NH-38) from km 0+000 (Chotahapjan) to km 16+900 (Bogapani section) (2-Lane+PS) in the State of Assam on EPC mode. (package-3) 2. Strengthening/Improvement to 2-lane with Paved Shoulder from km 16+900 (Bogapani) to km 27+150 (Golai gaon) on existing Dibrugarh to Ledo section with proposed Digboi Bypass (Green Field and Brown Field) (2 Lane+PS) of NH-315 (Old NH-38) in Tinsukhia District in the state of Assam on EPC mode (Package -4) 3. Strengthening / Improvement to 2-Lane with Paved Shoulder from km 27+150 (Golai Gaon) to km 47+682 (Ledo) on existing Dibrugah to Ledo section with proposed Digboi Bypass (Green field and Brownfield) (2-Lane+PS) of NH-315 (Old NH-38) in Tinsukhia District in the State of Assam on EPC Mode. Package -5) 2nd Call"
69.

Consultancy Services as Authority’s Engineer for Development of existing 2 Lane NH-1 from 8.660 to 33.775 (Sumbal to Wayul) to 4 Lane dual carriageway NH standard as part of Srinagar Ring Road Phase II (Design Ch. 44+907 to Ch. 66+609) under Bharatmala Pariyojna Phase – I in the Union Territory of Jammu and Kashmir on EPC mode

Consultancy Services as Authority’s Engineer for Development of existing 2 Lane NH-1 from 8.660 to 33.775 (Sumbal to Wayul) to 4 Lane dual carriageway NH standard as part of Srinagar Ring Road Phase II (Design Ch. 44+907 to Ch. 66+609) under Bharatmala Pariyojna Phase – I in the Union Territory of Jammu and Kashmir on EPC mode
70.

Consultancy Services for Authority’s Engineer Services for Supervision of Rehabilitation and Up-gradation of Mukhed to Nanded from Km 373+000 to Km 388+400 of NH-161A i.e. Nanded – Bhokar -Himayatnagar+Kinwat-Mahur-Arani Road (Design Chainage from K. 372+000 (Makhed) to Km 387+650 (Nanded) of NH-161A (Length 15.65 Km) to 2/4 Lane with paved Shoulders configuration in the state of Maharashtra on EPC Mode

Consultancy Services for Authority’s Engineer Services for Supervision of Rehabilitation and Up-gradation of Mukhed to Nanded from Km 373+000 to Km 388+400 of NH-161A i.e. Nanded – Bhokar -Himayatnagar+Kinwat-Mahur-Arani Road (Design Chainage from K. 372+000 (Makhed) to Km 387+650 (Nanded) of NH-161A (Length 15.65 Km) to 2/4 Lane with paved Shoulders configuration in the state of Maharashtra on EPC Mode
71.

Program Management Consultancy (PMC) Services for Implementation of Assam Resilient Rural Bridges Program (ARRBP)

Program Management Consultancy (PMC) Services for Implementation of Assam Resilient Rural Bridges Program (ARRBP)

72.

Safety Consultant for (Construction / up-gradation of two loane with paved shoulder of NH-70 from Munabao (NH-25E) -Sundra- Myajlar

Safety Consultant for (Construction / up-gradation of two loane with paved shoulder of NH-70 from Munabao (NH-25E) -Sundra- Myajlar - Dhanana –Asutar -Ghotaru -Tanot (Design Chainage Km. 0.00 to Km. 46.00 & Km. 82.600 to 310.467) under Phase I of Bharatmala Pariyojna (Total Length 273.867 Km) on Hybrid annuity Mode (HAM) in the State of Rajasthan (Length 273.867 Km)

73.

Selection of Independent Engineer for Zeroroad Bus Station (Prayagraj)

Selection of Independent Engineer for Zeroroad Bus Station (Prayagraj)

74.

Selection of Independent Engineer for Agra Fort Bus Station (Agra)

Selection of Independent Engineer for Agra Fort Bus Station (Agra)

75.

Selection of Independent Engineer for Raebarelly Bus Station (Lucknow)

Selection of Independent Engineer for Raebarelly Bus Station (Lucknow)

76.

Appointment of Consultancy Services for Preparation of Feasibility Study cum Detailed Project Report for Construction of Kajirda Padsali New Ghat Raod in Ratnagiri District in the State of Maharashtra

Appointment of Consultancy Services for Preparation of Feasibility Study cum Detailed Project Report for Construction of Kajirda Padsali New Ghat Raod in Ratnagiri District in the State of Maharashtra
77.

Feasibility Study/Detailed Engineering Survey and Preparation of Detailed Survey Report for proposed Ghat Raod from Devde Bhovde to Vishalga

Feasibility Study/Detailed Engineering Survey and Preparation of Detailed Survey Report for proposed Ghat Raod from Devde Bhovde to Vishalgad District Border for Connecting in Shahuwadi Taluka Km. 0.00 to 15.00 Length Taluka Sangmeshwar Distrct Ratnagiri in the State of Maharashtra

78.

Consultancy services for Preparation of Detailed Project Report for Rehabilitation and Up gradation 4 L Standard of Patur - Balapur - Shegaon NH

Consultancy services for Preparation of Detailed Project Report for Rehabilitation and Up gradation 4 L Standard of Patur - Balapur - Shegaon NH-161G (Design Km. 0/000 to Km. 33/200 & Design Km. 36/600 to Km. 54/800) (Total Length = 51.400 Km) in the state of Maharashtra on EPC Mode

79.

Consultancy Services for Authroitys Engineer for Supervision of Upgradation and Reconstruction of Shahpura

Consultancy Services for Authroitys Engineer for Supervision of Upgradation and Reconstruction of Shahpura - Dindori - section of NH-45 from Km. 103.700 (Design) to Km. 164.580 (Design) including 03 Bypasses (Total Length 60.88 Km) to Two Lane with One time improvement of 03 Nos. bypassed built-up areas in a total length of 12.341 km in the State of Madhya Pradesh on EPC mode.

80.

Feasibility Consultant for preparation of Detailed Feasibility Report for up-gradation of

Feasibility Consultant for preparation of Detailed Feasibility Report for up-gradation of Mandhna - Gangabairaj - Achalganj - Purwa - Mohanlalganj Road (SH-173), Length 104.00 Km in Uttar Pradesh.

81.

Feasibility Consultant for Preparation of Detailed Feasibility Report for up-gradation of Bani

Feasibility Consultant for Preparation of Detailed Feasibility Report for up-gradation of Bani - Mohan - Bagarmau - Bilhour Road (SH-40), Length 92.00 Km. in Uttar Pradesh

82.

Feasibility Consultant for Preparation of Detailed Feasibility Report for up-gradation of Daboh

Feasibility Consultant for Preparation of Detailed Feasibility Report for up-gradation of Daboh - Punch - Gursarai - Tikamgarh Road (SH-131), Length 106.090 Km. in Uttar Pradesh

83.

Feasibility Consultant for Preparation of Detailed Feasibility Report for up-gradation of Bhoginipur

Feasibility Consultant for Preparation of Detailed Feasibility Report for up-gradation of Bhoginipur - Jhinjak - Visdhan - Bilbour Road (SH-114), Length 112.405 Km in Uttar Pradesh.

84.

Consultancy Services for the preparation of Feasibility Studies and Detailed Project

Consultancy Services for the preparation of Feasibility Studies and Detailed Project Report for the work of Rehabilitation and Upgradation of 2/4 lane paved shoulder of Buldhana - Khamgaon road Section of NH-753E including flyover in Botha forest. (Length 47.5 Km) in Buldhana District in the State of Maharashtra.

85.

Empanelment of Project Development & DPR Consultants for development of Expressway under aegis of UPEIDA

Empanelment of Project Development & DPR Consultants for development of Expressway under aegis of UPEIDA on Unit Lane Length Basis

Copyright - All Rights Reserved © www.almondzglobalinfra.com | Powered by ITPL