Completed Projects

Filter Projects:

1.

Zozila Tunnel on Srinagar SonamargGumri Road (NH-1) in the state of J & K on Design, Build, Fina

Zozila Tunnel on Srinagar SonamargGumri Road (NH-1) in the state of J & K on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity Basis (PPP).
2.

Charges for Carried out the Safety Audit for the project "Construction of 4-Lane Flyover of NH-

Charges for Carried out the Safety Audit for the project "Construction of 4-Lane Flyover of NH-3 at Morena Town in Madhya Pradesh
3.

Consultancy Services for Preparation of DPR for construction of road, tunnel, viaduct and Churhat by

Consultancy Services for Preparation of DPR for construction of road, tunnel, viaduct and Churhat bypass of Rewa-Sidhi Section of NH 75 in Madhya Pradesh
4.

Procurement of Technical Consultant for Preparation of DPR for Rehabilitation and upgradation of NH

Procurement of Technical Consultant for Preparation of DPR for Rehabilitation and upgradation of NH Stretches (with tunnel) AutramGhat section, Maharashtra
5.

Preparation of DPR Package 13: Jintur -AundhaNagnath-Shirod- Sahapur-Vasmat-Nanded in Maharashtra, f

Preparation of DPR Package 13: Jintur -AundhaNagnath-Shirod- Sahapur-Vasmat-Nanded in Maharashtra, for up-gradation to Two Lanes / Four lane.
6.

Preparation of DPR for Package 15: Jalna - Vatur - Mantha - Jintur - Bori - Zari - Parbhani in Maha

Preparation of DPR for Package 15: Jalna - Vatur - Mantha - Jintur - Bori - Zari - Parbhani in Maharashtra, for up-gradation to Two Lanes / Four lane
7.

Feasibility and Pre bid Engineering and financial modeling & analysis of “Widening & S

Feasibility and Pre bid Engineering and financial modeling & analysis of “Widening & Strengthening of the Existing Bikaner – Phalodi Section of Four Lane , Rajasthan
8.

Pre bid Engineering services for the work 4/6 laning of Raipur – Bilaspur section in Chattisga

Pre bid Engineering services for the work 4/6 laning of Raipur – Bilaspur section in Chattisgarh to be executed as BOT (Toll) on DBFOT Pattern
9.

Independent Engineer services for 4 laning of Rohtak to Hissar section of NH-10 to be executed on

Independent Engineer services for 4 laning of Rohtak to Hissar section of NH-10 to be executed on BOT(Toll) project on DBFOT Pattern in Haryana
10.

Independent Engineer for Development & operation / maintenance of Sikar – Bikaner section

Independent Engineer for Development & operation / maintenance of Sikar – Bikaner section
11.

Four laning of NH-33 from Mahullia to Behragora and from Behragora to Kharagpur of NH-6sections in J

Four laning of NH-33 from Mahullia to Behragora and from Behragora to Kharagpur of NH-6sections in Jharkhand/West Bengal on Design, Build, Finance and Transfer Basis.
12.

Design, Engineering, Construction, Development, Finance, Operation and maintenance of Panikoili- Rim

Design, Engineering, Construction, Development, Finance, Operation and maintenance of Panikoili- Rimuli Section, Odhissa
13.

Chitradurga - Shimoga Section of NH 13 in Karnataka on DBFOT Basis (PPP)

Chitradurga - Shimoga Section of NH 13 in Karnataka on DBFOT Basis (PPP)
14.

Four Laning of Madurai- Ramanathapuram Section of NH-49 on EPC Mode

Four Laning of Madurai- Ramanathapuram Section of NH-49 on EPC Mode
15.

Four laning of Nagpur-Hyderabad Section of NH-7,Package NS-60 (MH) in Maharashtra

Four laning of Nagpur-Hyderabad Section of NH-7,Package NS-60 (MH) in Maharashtra
16.

Four laning of Jabalpur – Lakhnadon section of NH-7 in Madhya Pradesh

Four laning of Jabalpur – Lakhnadon section of NH-7 in Madhya Pradesh
17.

2 laning of Jowai – Meghalaya / Assam Border section of NH-44, in Meghalaya.

2 laning of Jowai – Meghalaya / Assam Border section of NH-44, in Meghalaya.
18.

Design, Engineering, Finance, Construction, Operation & Maintenance of Amritsar-Wagah Border sec

Design, Engineering, Finance, Construction, Operation & Maintenance of Amritsar-Wagah Border section
19.

Four Laning of Armur to AdloorYellareddy in Nagpur-Hyderabad section of NH-7 , Andhra Pradesh

Four Laning of Armur to AdloorYellareddy in Nagpur-Hyderabad section of NH-7 , Andhra Pradesh
20.

Four laning of Devihalli-Hassan Section of NH-48 , Karnataka on Build, Operate and Transfer (BOT) T

Four laning of Devihalli-Hassan Section of NH-48 , Karnataka on Build, Operate and Transfer (BOT) Toll basis
21.

Four laning of Sambalpur-Baragarh-Orissa/Chattisgarh Border Section in Odisha to be executed as BOT

Four laning of Sambalpur-Baragarh-Orissa/Chattisgarh Border Section in Odisha to be executed as BOT
22.

Four Laning of Bhubaneswar - Puri section of NH 203 in Orissa to be executed as BOT (Toll) Project o

Four Laning of Bhubaneswar - Puri section of NH 203 in Orissa to be executed as BOT (Toll) Project on DBFOT Pattern
23.

Four laning of Indore to Gujarat section of NH-59 in Madhya Pradesh

Four laning of Indore to Gujarat section of NH-59 in Madhya Pradesh
24.

Six Lane Elevated Highway and ground level Highway on NH-2 (Delhi-Agra Section)

Six Lane Elevated Highway and ground level Highway on NH-2 (Delhi-Agra Section)
25.

Four-laning of Bhubaneshwar-Puri Section of NH-203 in Odisha

Four-laning of Bhubaneshwar-Puri Section of NH-203 in Odisha
26.

Four laning of Muzaffarnagar-Haridwar section in the state of UP and Uttarakhand

Four laning of Muzaffarnagar-Haridwar section in the state of UP and Uttarakhand
27.

Four Laning of Rai Malikpur (Rajasthan Border) – Narnaul – Mahendragarh - Dadri- Bhiwani

Four Laning of Rai Malikpur (Rajasthan Border) – Narnaul – Mahendragarh - Dadri- Bhiwani - Kharak Corridor Project being undertaken on Design, Build, Finance, Operate and Transfer
28.

4/6-lane section of Walayar – Vadakkancherry section on National Highway No 47, Kerela, as a P

4/6-lane section of Walayar – Vadakkancherry section on National Highway No 47, Kerela, as a Public Private Partnership Project on BOT Basis.
29.

Financial/ Legal Consultancy Services for Project Development of 6 Lane of Kundli – Manesar Ex

Financial/ Legal Consultancy Services for Project Development of 6 Lane of Kundli – Manesar Express way in Haryana
30.

Development of Six-Lane Eastern Peripheral Expressway in Haryana and Uttar Pradesh

Development of Six-Lane Eastern Peripheral Expressway in Haryana and Uttar Pradesh
31.

Financial/ Legal Consultancy Services for Project Development of 6 Lane of Manesar – Palwal Ex

Financial/ Legal Consultancy Services for Project Development of 6 Lane of Manesar – Palwal Expressway in Haryana
32.

6 -lane section of Vadakkancherry - Thissur section on National Highway No 47 in Kerela

6 -lane section of Vadakkancherry - Thissur section on National Highway No 47 in Kerela
33.

Design, Engineering, Construction, Development, Finance, Operation and maintenance of Hyderabad Vija

Design, Engineering, Construction, Development, Finance, Operation and maintenance of Hyderabad Vijayawada section.
34.

Technical & Financial Feasibility, Preparation of Bid Documents and Bid Process Management etc.

Technical & Financial Feasibility, Preparation of Bid Documents and Bid Process Management etc. for development of Passenger Ropeway between Bhuntar to BijliMahadev in Kullu(H.P) on PPP mode.