Roads, Bridges, Highways & Tunnels

Filter Projects:

road, tunnel, viaduct & Churhat Bypass of Rewa-Sidhi section of NH-75E

Consultancy services for preparation of Detailed Project Report for construction of road, tunnel, viaduct & Churhat Bypass of Rewa-Sidhi section of NH-75E from CH. 33/200 to 55/400 in the state of Madhya Pradesh

Kali Mandir

Consultancy Services for Preparation of Feasibility cum Detailed Project Report for the Work of Fly Over at Kali Mandir Lower Lake to Railway Station, Bhopal

PACKAGE NO. 7 Autram Ghat Section

Consultancy Services for Project Management including preparation of Feasibility Study/Detailed Project Report of Hospet (NH-67) – Hampi – Gangawati -Sindhnur (NH-150 A). for NH connectivity to Backward areas/Religious/Tourist places (BRT) scheme. (Pkj No.: T/7, Length 80 km)

(BRT)

Consultancy Services for Project Management including preparation of Feasibility Study/Detailed Project Report of Hospet (NH-67) – Hampi – Gangawati -Sindhnur (NH-150 A). for NH connectivity to Backward areas/Religious/Tourist places (BRT) scheme. (Pkj No.: T/7, Length 80 km)

Mansar- Ramtek- Tumsar- Tirora- Gondia- Balaghat- Seoni

Feasibility study and Preparation of Detailed Project Report for 4/2 lane road with paved shoulders of following sections of National Highways in the State of Maharashtra. Package 3: Mansar- Ramtek- Tumsar- Tirora- Gondia- Balaghat- Seoni upto NH-7. Length- 140 km

Pkg. No. :-13 Jintur-Aunda Nagnath-Shirod-Shahapur-Vasmat-Nanded

Consultancy Services for Project management Phase I including Preparaton of Detailed Project Report of Selected Stretches / Corridors of Road Networks in the State of Maharashtra for up Gradation to Two Lane Paved Shoulder / Four Lane Configuration. "Pkg. No. :-13 Jintur-Aunda Nagnath-Shirod-Shahapur-Vasmat-Nanded."

Pkg. No. :-15 Jalna-Vatur-Mantha-Jintur-Bori-Zari-Parbhani

Consultancy Services for Project management Phase I including Preparaton of Detailed Project Report of Selected Stretches / Corridors of Road Networks in the State of Maharashtra for up Gradation to Two Lane Paved Shoulder / Four Lane Configuration. "Pkg. No. :-15 Jalna-Vatur-Mantha-Jintur-Bori-Zari-Parbhani Km 60/200 to 132/900 (Section from Jalna-Vatur MSH-2 and Section from Deogaon-Jintur-Parbhani SH-248."

Package 9- NH-53 Badnera Road- Nagzari Kharda road

Consultancy services for Project Management Phase I incuding preparation of Detailed Project Report of selected stretches/ corridors of Road Networks in the state of Maharashtra for up gradation to Two lane paved shoulder/ Four lane configuration - Package 9- NH-53 Badnera Road- Nagzari Kharda road (section from Belora Kherda Karanja Mangrulpir SH 280 and SH 274 and Murtizapur to Kherda SH 282 excluding Badnera Nagzari

6 Road Projects

Consultancy services for carrying out Traffic studies of the 6 Road Projects of Reliance

(Package 13) (MBIU) (MORTH)

Consultancy Assignmnet of collection and analysis of bridge condition and bridge inventory data by MBIU or any other equipment for the purpose of the Major/Minor Bridges on all NHs including those with NHAI for a period of three years as per RFP and subsequent amendment/corrigendum in the state of tamil Nadu & Puducherry (Package 13) (MBIU) (MORTH)

Jaspur – Govindpur – Dumri – Mahuadanr (Jharkhand) Pkg - NH/IAHE/32

Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways/ State Roads (approved “In Principle” for declaration as National Highways) for up gradation to Two/Four lane with paved shoulder configuration.” Jaspur – Govindpur – Dumri – Mahuadanr (Jharkhand) Pkg - NH/IAHE/32

Dudu connecting Naraina, Sambhar, Nawan, Narayanpura, Kuchaman City, Buds, Toshina and terminating at Chhoti Khatu

Consultancy Services for Feasibility Study/Detailed Engineering Report for Construction of Two Lane with paved shoulder Newly proposed NH road (approved “in principle” for declaration as NH) from junction of NH-48 Near Dudu connecting Naraina, Sambhar, Nawan, Narayanpura, Kuchaman City, Buds, Toshina and terminating at Chhoti Khatu Near NH-458 Length-117 Km (job No. NH-in principal/RJ/2016-17/888)

National Highways) for up gradation to Two/Four lane with paved shoulder configuration

Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways / State Roads (approved “In Principle” for declaration as National Highways) for up gradation to Two/Four lane with paved shoulder configuration. (Name of Stretch: Dighi-Agardanda-Nagothane-Manded-Tala-Indapur

Jaigad Port to NH66 through Nivali –Jaigad (SH-64)

Consultancy Services for Project Management Phase I including preparation of Detailed Project Report of selected stretches/corridors of National Highways / State Roads (approved “In Principle” for declaration as National Highways ) for up gradation to Two/Four lane with paved shoulder configuration. (Name of Stretch: Jaigad Port to NH66 through Nivali –Jaigad (SH-64) and coastal Highway (MSH-4))

Office Building at Dwarka Sec-10

Consultancy Services for Supervision of operation and routine Maintenance contract of NHAI corporate Office Building at Dwarka Sec-10, New Delhi and MTNL Building Sec-19 Dwarka (Hired accomodation)

Development of greenfield bypass road for better connectivity of Gangavaram port in Visakhapatnam District

Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for Development of greenfield bypass road for better connectivity of Gangavaram port in Visakhapatnam District (Lanes to be specified)upgradation 2/4 lane NH connectivity under Sagarmala Scheme.

Upgradation to 6 lane with paved shoulders of Rajkot-Bamanbore section of NH-8A

Pre-Tender consultancy serices for the work of "Upgradation to 6 lane with paved shoulders of Rajkot-Bamanbore section of NH-8A (New NH-47) from Km.185+000 to Km.216+000 on EPC mode in the state of Gujarat.(Package-5)

Four/Six Laning Solapur to Bijapur section of NH 13 (new NH No. 52)

Pre-Tender Consultancy Services for the work of Four/Six Laning Solapur to Bijapur section of NH 13 (new NH No. 52) from Km 0+000 to Km 110+542 (Design length 109.08 Km) in the state of Maharashtra and Karnataka to be executed as BOT(Toll) Project on DBFOT Pattern under NHDP Phase-III

Smart Road (Package 1 Civil Works) in ABD Area of Jaipur 7.073 Kms.

Consultancy Services for Design & Drawing and Survey works for Development of Smart Road (Package 1 Civil Works) in ABD Area of Jaipur 7.073 Kms.

Detail Design for Four Laning of Warnga - Mahagaon Section of NH - 361 from Km 253.700 to Km 320.580

Detail Design for Four Laning of Warnga - Mahagaon Section of NH - 361 from Km 253.700 to Km 320.580 (Existing Chainage from Km 228.840 to Km 611.920) in the State of Maharashtra on Hybrid Annuity Mode under NHDP Phase – IV

Construction of six lane Vadodara Kim Expressway from Km 355.00 to Km 378.740

Pre Tender Consultancy Services for Sadbhav for the Work of "Construction of six lane Vadodara Kim Expressway from Km 355.00 to Km 378.740 (Padra to Vadodara Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase IV on EPC Mode (phase IA-Package I)

Construction of six lane Vadodara Kim Expressway from Km 323.000 to Km 355.000

Pre Tender Consultancy Services for Sadbhav for the Work of "Construction of six lane Vadodara Kim Expressway from Km 323.000 to Km 355.000 (Sanpa to Padra Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase IV on EPC Mode (Phase IA-Package II)

Construction of six lane Vadodara Kim Expressway from Km 292.00 to Km 323.00

Construction of 4 lane road on NH-12 (New NH-52) from Km 299.000 to 346.540

Pretender Consultancy services for "Construction of 4 lane road on NH-12 (New NH-52) from Km 299.000 to 346.540 (Design chainage from 9.860 to 58.740) (Darah-Jhalawar-Teendhar section) in the state of Rajasthan under NHDP Phase-III on hybrid Annuity Mode (Length 48.880 km) - Pckage II

Four lane road including three flyovers and one elevated corridor on existing Fafadih

Safety Consultancy Services for construction of "Four lane road including three flyovers and one elevated corridor on existing Fafadih-Telibandha-Naya Raipur narrow gauge railway track in the state of Chhattisgarh on engineering procurement & construction (EPC) mode."

Four lane road including three flyovers and one elevated corridor on existing Fafadih

Proof Consultancy Services for construction of "Four lane road including three flyovers and one elevated corridor on existing Fafadih-Telibandha-Naya Raipur narrow gauge railway track in the state of Chhattisgarh on engineering procurement & construction (EPC) mode."

Widening of Pipli-Bhavnagar Section: Package-1 from Km 136.000 to 168.800

Pre-Tender Consultancy Services for the work of "Widening of Pipli-Bhavnagar Section: Package-1 from Km 136.000 to 168.800 (near Adhelaivillage to Nari junction) to four lane from existing 10 meter wide road in the state of Gujarat on EPC mode".

6-laning of Chitradurga to Davanagere including newly proposed Chitradurga Bypass (km 189.00 to Km 260)

6-laning of Chitradurga to Davanagere including newly proposed Chitradurga Bypass (km 189.00 to Km 260) of NH-4 in the state of Karnataka to be executed as Hybrid Annuity Project on DBFOT Pattern under NHDP Phase V – Financial Consultant – NHAI

4-laning of NH-73 Gagalheri-Saharanpur-Yamunanagar (UP-Haryana Border)

4-laning of NH-73 Gagalheri-Saharanpur-Yamunanagar (UP-Haryana Border) from km. 35.4 (km. 33.000 of NH-73) to km. 86.855 (km. 70.890 of NH-73) Pkg.II in the State of Uttar Pradesh under NHDP-IV on Hybrid Annuity mode– Financial Consultant – NHAI

Four laning of Varanasi Gorakhpur section of NH-29 from km 148.000 (Design chainage 149.540)

Four laning of Varanasi Gorakhpur section of NH-29 from km 148.000 (Design chainage 149.540) to km 208.300 (Design chainage 215.160) [Package-IV Amilla Village to Gorakhpur] in the State of Uttar Pradesh under NHDP Phase-IV on EPC mode. – Financial Consultant – NHAI

Construction of Flyover at Chainage 161.900 of NH-37, Basistha Chariali (Guwahati Bypass)

Construction of Flyover at Chainage 161.900 of NH-37, Basistha Chariali (Guwahati Bypass) under PIU-Guwahati (Start chainage 146.00 end Chainage 163.895) on EPC mode in the state of Assam. – Financial Consultant – NHAI

Rehabilitation and upgradation of NH-4 from Km 133.36 to Km 171.59(Andhra Pradesh / Tamil Nadu to Nalagampali village)

Rehabilitation and upgradation of NH-4 from Km 133.36 to Km 171.59(Andhra Pradesh / Tamil Nadu to Nalagampali village) to four lane with paved shoulder in state of Andhra Pradesh under NHDP – IV on EPC mode. – Financial Consultant – NHAI

4 laning with paved shoulder of Porbandar-Dwarka section of NH-8E from km 356.766

4 laning with paved shoulder of Porbandar-Dwarka section of NH-8E from km 356.766 (design chainage km 379.100) to km 469.963(design chainage km 497.870) in the State of Gujarat (Package – 8). -  Financial Consultant – NHAI

Construction of Chilakaluripet bypass of NH – 5

Construction of Chilakaluripet bypass of NH – 5 (New NH-16)in the state of Andhra Pradesh on BOT basis - Financial Consultant - NHAI

4-laning of Aligarh-kanpur section from km 289.000

4-laning of Aligarh-kanpur section from km 289.000 (Design chainage 292.411) to km 356.000(Design chainage 363.394) [Package-IV from Naviganj-Mitrasen] of NH-91 in the state of Uttar Pradesh under NHDP Phase-IV on HAM -  Financial Consultant – NHAI

Four laning of NH-23 (new NH No.143) from km.240.250 i.e. Brahmani bypass

Four laning of NH-23 (new NH No.143) from km.240.250 i.e. Brahmani bypass end beside BNR weigh bridge to km 287.200 i.e. Rajamunda Section in the state of Odisha under NHDP Phase IV on EPC mode - Financial Consultant – NHAI

4/6-lane section of Walayar – Vadakkancherry section on National Highway

4/6-lane section of Walayar – Vadakkancherry section on National Highway No 47 (NH-47) in the state of Kerala as a Public Private Partnership Project on BOT Basis - Financial Consultant - NHAI

6 Lane of Kundli – Manesar Express way in the state of Haryana on BOT

Financial/ Legal Consultancy Services for Project Development of 6 Lane of Kundli – Manesar Express way in the state of Haryana on BOT  Annuity basis - Haryana State Industrial & Infrastructure Development Corporation Ltd

Development of Six-Lane Eastern Peripheral Expressway

Development of Six-Lane Eastern Peripheral Expressway (NH No. NE – II) from km 1.000 to km 22.000 in the states of Haryana and Uttar Pradesh on EPC Mode - Financial Consultant - NHAI

Development of Six-Lane Eastern Peripheral Expressway (NH No. NE – II) from km 22.000 to km 46.500

Development of Six-Lane Eastern Peripheral Expressway (NH No. NE – II) from km 22.000 to km 46.500 (in the states of Haryana and Uttar Pradesh on EPC Mode - Financial Consultant - NHAI

Development of 6 Lane of Manesar – Palwal Express way in the state of Haryana on Item Rate basis

Financial/ Legal Consultancy Services for Project Development of 6 Lane of Manesar – Palwal Express way in the state of Haryana on Item Rate basis  - Haryana State Industrial & Infrastructure Development Corporation Ltd

6 -lane section of Vadakkancherry

6 -lane section of Vadakkancherry - Thissur section on National Highway No 47 (NH-47) in the state of Kerala as a Public Private Partnership Project on BOT Basis Basis - Financial Consultant – NHAI

Zozila Tunnel on Srinagar Sonamarg Gumri Road (NH-1) in the state of J & K

Zozila Tunnel on Srinagar Sonamarg Gumri Road (NH-1) in the state of J & K on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity Basis(PPP). – Financial Consultant  - MORT&H